bp truck Stops
BP Level 1 Truck Stop
Fibreglass Developments has been manufacturing the new kiosk starting to appear on numerous Truckstop sites around the country. Our work involved refinement of design, through to manufacture and assistance with installation of the prototype. A large number of non-composite components were involved including Frame, Glass electrics etc. All managed in house by Fibreglass Developments.
BP Level 2 Refurbishment
Level 2, Units originally built between 1995 and 1998 are finally coming back for a refurbishment. These have been working in some of the toughest environments around and have stood up well to some pretty punishing treatment.
In the original build, Fibreglass Developments was again responsible for a total turnkey solution, including refinement of design, manufacture of composite panels plus subcontract the construction of the column, booth frame, electrics etc.
Fibreglass Developments has been manufacturing the new kiosk starting to appear on numerous Truckstop sites around the country. Our work involved refinement of design, through to manufacture and assistance with installation of the prototype. A large number of non-composite components were involved including Frame, Glass electrics etc. All managed in house by Fibreglass Developments.
BP Level 2 Refurbishment
Level 2, Units originally built between 1995 and 1998 are finally coming back for a refurbishment. These have been working in some of the toughest environments around and have stood up well to some pretty punishing treatment.